Just as an observation, "grading a road" can have a few interpretations.
1. New road. Running equipment through a field or hillside and cutting down into a new area.
Something buried in a quick, shallow hole in a field is tilled up by the blade.
2. Old road. Running the blade across an existing road and unearthing something. The best place in the world to hide something is under a road or earthen dam. Those are designed to remain solid and undisturbed for many years. (The 3 civil rights workers at the bottom of a dam in Miss would never have been discovered without an informant.)
You can post now and register later.
If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.
1. New road. Running equipment through a field or hillside and cutting down into a new area.
Something buried in a quick, shallow hole in a field is tilled up by the blade.
2. Old road. Running the blade across an existing road and unearthing something. The best place in the world to hide something is under a road or earthen dam. Those are designed to remain solid and undisturbed for many years. (The 3 civil rights workers at the bottom of a dam in Miss would never have been discovered without an informant.)
The type of work becomes important.
Share this post
Link to post
Share on other sites