0
kleggo

Vector 2 main container flap closing sequence

Recommended Posts

Looking for some help from a "seasoned veteran" or a new guy" with good records.
Please tell me the correct closing sequence for the main container flaps on a Vector 2?
DOM = April 87 or 89, can't read the stamp clearly.
The "beauty flap" has the grommet offset to the side.

Thanks

Craig

Share this post


Link to post
Share on other sites
Quote

Quote

#3 right side, then #4 left side, in the Vector II manual.


thanks
bottom
top
right
left
seems to look correct.

cheers
Craig



Mnemonic:

Big Titted Rich Lady = Bottom Top Right Left
Peace,
-Dawson.
http://www.SansSuit.com
The Society for the Advancement of Naked Skydiving

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

0