FlyinDawg 0 #1 May 4, 2007 This is fourth of week construction of my house. They alreay added tubs and shower, also heater water by plumbman. First picture- They already add roof, windows, and "front work-door" Second picture- Same as above expect "work-door". They added a back porch door. Third picture- Took a photo from two-cars garage to general of a house. I was told by construction contractor, who is my mom's cousin. It suppose be done by September, but they said it seem should be done within 3 months or more.Flyin' Dawg or SkyDog "To understand is to forgive, even oneself." Quote Share this post Link to post Share on other sites
Beerlight 0 #2 May 4, 2007 like the pictures bro. Keep em coming. Drink more beer......... Quote Share this post Link to post Share on other sites
Acensky 0 #3 May 4, 2007 Nice lookn house! HeatherGarbage bags do not make good parachutes. Quote Share this post Link to post Share on other sites
FlyinDawg 0 #4 May 9, 2007 Right today, they already put all shingles on roof and they already built pump/toolhouse today. It's all done. Also, A/C and heater came by since Monday to add it. Also, a guy added switches and outlets since monday too. I was told to they will build with bricks as I chosen, should be start by Friday. Depend on weather, of course.Flyin' Dawg or SkyDog "To understand is to forgive, even oneself." Quote Share this post Link to post Share on other sites
popsjumper 2 #5 May 9, 2007 So...Billy, Where's the jacuzzi, the wet bar, the beer fridge and the stripper pole? Next question...when's the house-warming party? PS: Don't invite Billy Vance. He will tear it all up and re-model it just for the fun of it. My reality and yours are quite different. I think we're all Bozos on this bus. Falcon5232, SCS8170, SCSA353, POPS9398, DS239 Quote Share this post Link to post Share on other sites