Jump to content

Mandatory Inspection of Skyhook equipped rigs

By adminon - Read 1287 times

Riggers (and owners), please be sure that the Sky hook hardware is sewn to the white free bag bridle correctly on all sky hook equipped rigs shipped between October 12 and December 1, 2003. There is a drawing of the correct installation and set-up sewn right next to the Sky hook on every rig, and the Sky hook itself is labeled.

However, if the Sky hook hardware were sewn on the bridle backwards during manufacture or subsequent repair, (with the pointed end of the hook facing the pilot chute, instead of the bag) then you would tow your reserve pilot chute if deployed in response to a main total malfunction. As the instructions state, this pilot chute in tow can be fixed by pulling the yellow RSL tab.

Remember, this situation can only be caused by an installation error at the factory, or during a rigger repair of a damaged bridle. It cannot be caused by a packing error. A PSB (PSB#20031203) has been issued in regards to this issue.

>Download the Service Bulletin PDF
>Relative Workshop Web Site
>Gear and Rigging Forum
0
0

SIGN UP OR LOGIN

Create a free account or login to comment on this article.

Sign Up Login

Buy from these trusted stores

User Feedback


There are no comments to display.



Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×