Riggers (and owners), please be sure that the Sky hook hardware is sewn to the white free bag bridle correctly on all sky hook equipped rigs shipped between October 12 and December 1, 2003. There is a drawing of the correct installation and set-up sewn right next to the Sky hook on every rig, and the Sky hook itself is labeled.
However, if the Sky hook hardware were sewn on the bridle backwards during manufacture or subsequent repair, (with the pointed end of the hook facing the pilot chute, instead of the bag) then you would tow your reserve pilot chute if deployed in response to a main total malfunction. As the instructions state, this pilot chute in tow can be fixed by pulling the yellow RSL tab.
Remember, this situation can only be caused by an installation error at the factory, or during a rigger repair of a damaged bridle. It cannot be caused by a packing error. A PSB (PSB#20031203) has been issued in regards to this issue.
Download the Service BulletinRelative Workshop Web Site
Gear and Rigging Forum
There are no comments to display.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.