|
|
|
Account · Help |
| Home | Forums | Safety | Dropzones | Gear | Classifieds | Photos | Videos | News | Calendar |
| New Articles Top Rated Articles |
|
|
Service Bulletin - Quasar IIPosted Thu Apr 19 2007By Tom Noonan SERVICE BULLETIN #26 - ISSUE DATE: April 18, 2007 SUBJECT: Quasar II, P/N115100, Quasar II Trainer P/N115102, Military Quasar II P/N 115103. Quasar II Reserve pilot chute launch under conditions with main canopy still in main container. IDENTIFICATION: All Quasar II harness/container systems. Including both Quasar IIs with ‘Flinger/PRO’ (Positive Reserve Opening) assembly installed as original installation or modification, and those without. STATUS: Mandatory removal of ‘Flinger’/PRO assembly and replacement of inner sub-flap with pilot chute Base Plate and pilot chute before next jump. BACKGROUND: Recent on-the-ground activations of several Quasar II reserve containers with the main canopy still in the container, showed slow or impeded pilot chute activation. There have been no reports of in-air incidents. Repeated tests with the main tray open and riser covers off (simulating an open main to reserve cutaway), resulted in clean reserve pilot chute deployments clearing the reserve container. Further testing revealed the steel ‘Flinger’/PRO assembly may take a set beyond the designed acceptable range, restricting movement of the side flaps and reserve pilot chute. SERVICE BULLETIN: As a precautionary measure, Strong Enterprises requests that all Quasar II systems be returned to Strong Enterprises for modification, that includes:
11236 SATELLITE BLVD ORLANDO, FL 32837 Tel 407 859 9317 Fax 407 850 6978 ted@strongparachutes.com www.strongparachutes.com More articles in this category:
|
|
|
|||
|
|
|
|